TASOLUK DRINKING WATER TREATMENT PLANT

Project Title:Tasoluk Drinking Water Treatment Plant
Employer :Istanbul  Metropolitan Municipality Water and Sewerage Department
Location :Istanbul / Turkey
Complation Date :2006
Partnership :GURIS – TURKERLER Joint Venture
Brief Description :

Turnkey construction of the drinking water treatment plant including civil,   electrical and mechanical works.

  
  • TAŞOLUK DRINKING WATER TREATMENT PLANT
  • TAŞOLUK DRINKING WATER TREATMENT PLANT

TARSUS WASTE WATER TREATMENT PLANT

Project Title:Tarsus Waste Water Treatment Plant
Employer :Tarsus Municipality Water and Sewerage Department
Location :Mersin / Turkey
Completion Date :2001
Partnership:PWT Wasser und Abwassertechnik GmbH + GURIS + Arı İnşaat Consortium
Brief Description :
Turnkey construction of the waste water treatment plant with a capacity of 43.000 m3/day. Waste water treatment has been done by activated sludge treatment process with modified long ventilation that enables at the same time the control of the sludge stabilization, nitrification and de-nitrification.
  
  • TARSUS WASTE WATER TREATMENT PLANT
  • TARSUS ATIKSU ARITMA TESİSİNİN ANAHTAR TESLİMİ İNŞAATI, DEVREYE ALINMASI VE İŞLETMESİ
  • TARSUS WASTE WATER TREATMENT PLANT
  • TARSUS WASTE WATER TREATMENT PLANT

 

IZMIT DOMESTIC AND INDUSTRIAL WATER SUPPLY PROJECT

Project Title:Izmit Domestic and Industrial Water Supply Project
Employer :Izmit Water Co., Inc.
Location :Kocaeli, Turkey
Completion Date :1999
Partnership :GURIS - GAMA - WATER PROJECTS INTERNATIONAL Joint Venture
Brief Description :

Izmit Domestic and Industrial Water :Supply Project is the first water supply project on BOT basis in Turkey and  finance has been supplied by the private companies. Within the scope of the project following works have been realized:

Potable Water Purification Plant with capacity of 480.000 m³/day,

Pump Stations of Gebze with capacity of 345.000 m³/day

2 Water Tanks of 2.000 m³, including design, process, construction, supply of equipment and   erection works

  
  • İZMİT DOMESTIC AND INDUSTRIAL WATER SUPPLY PROJECT
  • İZMİT DOMESTIC AND INDUSTRIAL WATER SUPPLY PROJECT
  • İZMİT DOMESTIC AND INDUSTRIAL WATER SUPPLY PROJECT
  • İZMİT DOMESTIC AND INDUSTRIAL WATER SUPPLY PROJECT

 

 

TRABZON WATER TREATMENT PLANT

Project Title:Trabzon Water Treatment Plant
Employer :Bank of Provinces
Location  :Trabzon / Turkey
Completion Date :1992
Brief Description :

The project comprises the construction of water treatment plant with a   capacity of 165.000 m³/day and auxiliary  facilities, including design   mechanical and electrical  equipment supply, instrumentation   and erection on turn-key basis.

  
  • TRABZON WATER TREATMENT PLANT
  • TRABZON WATER TREATMENT PLANT
  • TRABZON WATER TREATMENT PLANT
  • TRABZON WATER TREATMENT PLANT

 

ESKISEHIR WATER TREATMENT PLANT

Project Title:Eskisehir Water Treatment Plant
Employer :Bank of Provinces
Location :Eskisehir / Turkey
Completion Date :1990
Brief Description :

The project comprises the construction of water treatment plant with a capacity of 320.000 m³/day and auxiliary facilities, including design mechanical and electrical equipment supply, instrumentation and erection on turn-key basis.

  
  • ESKİŞEHİR WATER TREATMENT PLANT
  • ESKİŞEHİR WATER TREATMENT PLANT
  • ESKİŞEHİR WATER TREATMENT PLANT
  • ESKİŞEHİR WATER TREATMENT PLANT
  • ESKİŞEHİR WATER TREATMENT PLANT

 

ANKARA WATER TREATMENT PLANT 1. AND 2. UNITS

Project Title:Ankara Water Treatment Plant 1. and 2. Units
Employer :General Directorate of State Hydraulic Works (DSI)
Location :Ankara / Turkey
Completion Date  :1985 (1. Unit)
Completion Date  :1993 (2. Unit)
Partnership :GURIS + WATER PROJECT INTERNATIONAL LTD. Joint Venture
Brief Description :
First Unit: Covers the turnkey delivery of the process, design, construction, installation, equipment provision and erection works of the drinking water purification plants having a capacity of 564.000 m³/day.

Second Unit: Covers the turnkey delivery of the process, design, construction, installation, equipment provision and erection works of the drinking water purification plants having a capacity of 564.000 m³/day.

 

  
  • ANKARA WATER TREATMENT PLANT 1. AND 2. UNITS
  • ANKARA WATER TREATMENT PLANT 1. AND 2. UNITS
  • ANKARA WATER TREATMENT PLANT 1. AND 2. UNITS
  • ANKARA WATER TREATMENT PLANT 1. AND 2. UNITS

 

QUICK LINKS
PROJELERİMİZ
CONTACT

ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA

Questions : Contact

Google Map   |   İletişim Formu

CONTACT

GURIS CONSTRUCTION ENGINEERING CO. INC.
ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA
TURKEY

 
© 2015 GÜRİŞ. All rights reserved.