BURSA RING ROAD PROJECT BETWEEN YALOVA DISTRICT SECTION TURANKOY JUNCTION

Project Title:Bursa Ring Road Project between  Yalova District Section Turankoy Junction
Employer :General Directorate of Highways
Location :Bursa / Turkey
Status :2015
Partnership :GURIS - GOCAY Joint Venture
Brief Description :

Bursa Ring Road Project between Yalova Junction-Turankoy Interchange, that is 40,3 km in length of which 32 km is highway and 8,3 km is access roads, comprises the earth works, reinforced concrete structures, superstructure, traffic safety, landscaping works, miscellaneous and secondary works. A 2x500 mt double tube tunnel, 3 viaducts with double lane of 2x1905 mt in length, 15 bridges and 130 underpasses and culverts in various dimensions are in the scope of this road.

  
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)
  • BURSA ÇEVRE YOLU, YALOVA-AYRIMI-TURANKÖY KÖPRÜLÜ KAVŞAĞI KESİMİ (KM:2+000 – 27+000)

 

GIRESUN-ESPIYE STATE HIGHWAY BETWEEN KM: 0+000-24+576

Project Title:Giresun – Espiye State Highway Between Km: 0+000-24+576
Employer :General Directorate of Highways
Location :Giresun / Turkey
Completion Date :2009
Partnership :GURIS - METIS Joint Venture
Brief Description :

The project comprises the construction  the state highway with a total length of 24,5 km including sub-base, base and asphalt works and the construction of reinforced concrete structures, tunnels, bridges and viaducts. Within the scope of the project, Gülburnu Bridge has been constructed as a post-tensioned bridge using the free balanced cantilever method .Gülburnu Bridge is totally 330 meters long, having the middle span of 165 meters long and the edge spans of 2 x 82,5 meters long. Gülburnu Bridge is the longest single span reinforced concrete bridge with the middle span of 165 meters long.

  
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576
  • GİRESUN-ESPİYE STATE HIGHWAY BETWEEN KM: 0+000-24+576

 

SERVICE ROAD OF ALMUS DAM

Project Title:Service Road of Almus Dam
Employer :General Directorate of State  Hydraulic Works (DSİ)
Location :Tokat / Turkey
Completion Date :1966
Brief Description :

The project comprise the construction of a 38,5 km long service road around the dam’s reservoir  together with 132 conduits, 6 small and 4 long span bridges.

  
  • SERVICE ROAD OF ALMUS DAM
  • SERVICE ROAD OF ALMUS DAM
  • SERVICE ROAD OF ALMUS DAM

 

QUICK LINKS
PROJELERİMİZ
CONTACT

ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA

Questions : Contact

Google Map   |   İletişim Formu

CONTACT

GURIS CONSTRUCTION ENGINEERING CO. INC.
ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA
TURKEY

 
© 2015 GÜRİŞ. All rights reserved.