RAILWAY SYSTEMS

 

ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART

Project Title:Ankara Metro 3rd Stage Batıkent – Sincan Part
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :2011
Brief Description :

The project comprises the design and construction of  the metro line with a total length of 15,4 km and of  11 stations.

  
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART

 

METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2

Project Title:Metro line between Kızılay and Çayyolu 2
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :2011
Partnership :GURIS - AKTURK Joint Venture
Brief Description :

The project comprises the design and construction of the metro line with a total length of 16,59 km and of 11 station buildings.

  
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2

 

CONSTRUCTION OF UNKAPANI – TAKSİM PART OF İSTANBUL METRO

Project Title:Construction of Unkapanı – Taksim Part of Istanbul Metro
Employer :İstanbul Metropolitan Municipality
Location :İstanbul / Turkey
Completion Date :2005
Partnership :GURIS - YUKSEL - REHA - BASYAZICIOGLU Joint Venture
Brief Description :

Within the scope of  Unkapanı Taksim part of Istanbul Metro the tunnels have been constructed with NATM (New Austrian Tunneling Method) method including preliminary support system on decomposed, greywacke ground by umbrella arch system, PVC water insulation membrane, reinforced concrete internal lining of the tunnels, the prestressed anchorage wall of the stations. Total length of the tunnel is 4.029 meters. The concourse area of Sishane Station is 3.917 m2.

  
  • CONSTRUCTION OF UNKAPANI – TAKSİM PART OF İSTANBUL METRO

 

BURSA LIGHT RAIL SYSTEM PHASE I

Project Title:Bursa Light Rail System Phase I
Employer :Bursa Metropolitan Municipality
Location :Bursa / Turkey
Completion Date :2002
Partnership :GURIS - SIEMENS - SIMKO - TUVASAS - ANSALDO Joint Venture
Brief Description :

The scope of the project comprises the following;

ØOpen – Close Tunnel, underground and above ground stations, line works, water, sewerage, telecom, electric, natural gas NATO pipeline infrastructure displacement works,
ØConstruction, installation and steel construction works of the transmission and maintenance center (OMC Building with 10,000 m² indoor area) which is required for the system,
ØConstruction works between the route and operation and maintenance center and within the operation maintenance center area,
ØConstruction and installation works of 17 above ground and underground stations  planned along the route,
ØConstruction works of transformer / Rectifier centers which will meet the energy requirement of Phase I,
ØConstruction works related to the energy feeding lines, overhead systems, posts of the whole route.
  
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I

 

ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION

Project Title:Ankara Metro System 1st Stage Construction
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :1997
Partnership :GURIS - GAMA Joint Venture
Brief Description :

The project comprises the turn key construction of the metro line system of a total length of 14,44 km (double lines) between Kızılay and Batıkent in Ankara.

  
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION

 

CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION

Project Title:Construction of Ankaray and Ankara Metro Kızılay Common Station
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :1996
Partnership :GURIS - GAMA Joint Venture
Brief Description :

The project comprises the construction of Ankaray and Ankara Metro Kızılay Common Station, Mezzanine and Platform Floors and the Ankara Metro Switch Structure and Tail Tunnel by top down method.

  
  • CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION
  • CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION
  • CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION

 

QUICK LINKS
PROJELERİMİZ
CONTACT

ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA

Questions : Contact

Google Map   |   İletişim Formu

CONTACT

GURIS CONSTRUCTION ENGINEERING CO. INC.
ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA
TURKEY

 