GEOTHERMAL POWER PLANTS

 

EFELER 232.3 MW GEOTHERMAL POWER PLANTS

Project Title :EFELER 232.3 MW GEOTHERMAL POWER PLANTS
Employer :GURMAT ELECTRIC GENERATION CO. INC. 
Location:Germencik, İncirliova / Aydın / Turkey
Completion Date:
Efe 1 - August 2015

Efe 2 - September 2014

Efe 3 - March 2015

Efe 4 - July 2015

Efe 5 - December 2018

Efe 6 - August 2017

Brief Description :

Construction of the geothermal power plant with a total installed capacity of 162.3 MW including two 47.4 MW (EFE 1 - 2 - 3 - 4 - 5) Dual Flash Units, three 22.5 MW Binary Cycle Units and 22.6 MW (EFE 6) Binary Cycle Unit.



 
  • EFELER GEOTHERMAL POWER PLANTS
  • EFELER GEOTHERMAL POWER PLANTS
  • EFELER GEOTHERMAL POWER PLANTS
  • EFELER GEOTHERMAL POWER PLANTS
  • EFELER GEOTHERMAL POWER PLANTS
  • EFELER GEOTHERMAL POWER PLANTS
QUICK LINKS
PROJELERİMİZ
CONTACT

ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA

Questions : Contact

Google Map   |   İletişim Formu

CONTACT

GURIS CONSTRUCTION ENGINEERING CO. INC.
ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA
TURKEY

 
© 2015 GÜRİŞ. All rights reserved.