GURIS CONSTRUCTION & ENGINEERING CO. INC.  

Atik WPP, located in Hatay city, has an installed capacity of 30 MW and is generating 54.682.000 kWh of electricity annually.
 
18 MW part is in operation.

The plant has been added to our Group on 7.4.2017.
QUICK LINKS
PROJELERİMİZ
CONTACT

ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA

Questions : Contact

Google Map   |   İletişim Formu

CONTACT

GURIS CONSTRUCTION ENGINEERING CO. INC.
ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA
TURKEY

 
© 2015 GÜRİŞ. All rights reserved.