NEWS

27.04.2018
THE STUDENTS AND TEACHERS OF THE ELECTRICS DEPARTMENT OF DINAR / AFYON HAYDARLI MULTI PROGRAM ANADOLU HIGH SCHOOL HAS MADE A TECHNICAL VISIT TO OUR DINAR WIND POWER PLANT ON APRIL 24, 2018.
THE INFORMATION ABOUT THE WORKING SYSTEM OF CONTROL ROOM, SWITCHYARD AND WIND TURBINES HAS BEEN GIVEN TO THE STUDENTS. 

 

  • IMG-20180424-WA0060000.jpg..
  • IMG-20180424-WA0046.jpg..
  • IMG-20180424-WA0026.jpg..


« BACK


QUICK LINKS
PROJELERİMİZ
CONTACT

ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA

Questions : Contact

Google Map   |   İletişim Formu

CONTACT

GURIS CONSTRUCTION ENGINEERING CO. INC.
ANKARA CADDESİ NO: 222
KARAOĞLAN MAHALLESİ
GÖLBAŞI 06830
ANKARA
TURKEY

 
© 2015 GÜRİŞ. All rights reserved.