Table of Contents Table of Contents
Previous Page  7 / 86 Next Page
Information
Show Menu
Previous Page 7 / 86 Next Page
Page Background

7

1980

1982

1980

The Contract between DSI (State Hydraulic Works) and

GÜRİŞ - YÜKSEL JV for the construction of 4x175 MW

Altınkaya Dam and HEPP, one of the largest dams of

Turkey in Samsun, was signed.

4x175 MW gücünde Türkiye’nin en büyük Barajlarından

biri olan Samsun’daki Altınkaya Barajı ve HES Tesisleri

İnşaatı’nın sözleşmesi DSİ ile GÜRİŞ -YÜKSEL OG

arasında imzalandı.

1987

Joined to the

MIR CONTRACTING AND TRADE CO. INC.

as the founding partner.

The Moscow Office was opened in Russia.

MİR MÜTEAHHİTLİK VE TİCARET A.Ş.

’ye kurucu ortak

olarak iştirak edildi.

Rusya’da Moskova Ofisi açıldı.

Baghdad Office was established in Iraq.

The first overseas business was undertaken in Iraq. The

contract was signed for Extension Works of Falluja White

Cement Factory, Units III & IV.

Irak’ta Bagdat ofisi kuruldu.

İlk yurtdışı işi Irak’ta alındı. Falluja Beyaz Çimento

Fabrikası III. ve IV. Üniteler Tevsi İşleri mukavelesi

imzalandı.

1983

GÜRİŞ EXPORT, IMPORT AND MARKETING CO. INC.

was founded.

GÜRİŞ İHRACAT, İTHALAT VE PAZARLAMA A.Ş.

kuruldu.