MILESTONES/

Kilometre Taşları

1996

1992

The construction contract of Ankara Metro Stage I Kızılay-

Batıkent Line, the first Metro Project of Turkey, was signed.

Türkiye’nin ilk Metro Projesi olan Ankara Metrosu

I.Aşama Kızılay-Batıkent Hattı İnşaatının yapım

sözleşmesi imzalandı.

1990

MIRAJ TOURISM AND TRADE CO. INC.

was founded

and construction of its own hotel investment Miraj Park

Resort Hotel has been commenced in Antalya/Turkey.

OMTAS AUTOMATIVE TRANSMISSION ASSEMBLY

INDUSTRY & TRADE CO. INC.

has joined the Group.

MİRAJ TURİZM VE TİCARET A.Ş.

kuruldu ve Antalya’da

kendi otel yatırımı olan Miraj Park Resort Otel ’in

yapımına başladı.

OMTAS OTOMOTİV TRANSMİSYON AKSAMI SANAYİ

VE TİCARET A.Ş.

bünyeye katıldı.

1993

Contract for Construction and Erection of Çayırhan Thermal

Power Plant Units III and VI was signed.

Çayırhan Termik Santrali III. ve IV. Üniteleri İnşaatı ve

Montajı Sözleşmesi imzalandı.

1998

Bursa Light Rail System Phase I Construction Contract was

signed by the GÜRİŞ - Siemens Aktiengesellschaft - Simko -

Tuvasas Consortium.

Bursa Hafif Raylı Sistem 1. Aşama İmalat, İnşaat, Montajı

Sözleşmesi, GÜRİŞ - Siemens Aktiengesellschaft - Simko

- Tüvasaş Konsorsiyumu tarafından imzalandı.

1995

Contract for the realization of İzmit Urban and Industrial

Water Supply Project, the biggest water supply project

financed by the private sector as a first build-operate-transfer

model application of Turkey, was signed.

Türkiye’nin ilk Yap-İşlet-Devret modeli ile yapılan ve

finansmanı özel teşebbüs tarafından sağlanan

İzmit Kentsel ve Endüstriyel Su Temin Projesi’nin

gerçekleştirilmesi için sözleşme imzalandı.