Brief Description | : | Construction of the geothermal power plant with a total installed capacity of 162.3 MW including two 47.4 MW (EFE 1 - 2 - 3 - 4 ) Dual Flash Units, three 22.5 MW Binary Cycle Units, 22.6 MW (EFE 6) Binary Cycle Unit and 25 MW (EFE 7) Binary Cycle Unit. |