Brief Description | : | Construction of the geothermal power plant with a total installed capacity of 162.3 MW including two 47.4 MW (EFE 1 - 2 - 3 - 4 ) Dual Flash Units, three 22.5 MW Binary Cycle Units, 22.6 MW (EFE 6) Binary Cycle Unit 25 MW (EFE 7) Binary Cycle Unit and 50 MW (EFE 8) Binary Cycle Unit.
|