CORPORATE
WE HAVE A MESSAGE
IN MEMORY OF İDRİS YAMANTÜRK
MISSION, VISION AND VALUES
HISTORY OF GÜRİŞ
BOARD OF DIRECTORS
INFORMATION SECURITY MANAGEMENT SYSTEM
INTEGRATED MANAGEMENT SYSTEM
MEMBERSHIPS
CAREER
JOB APPLICATION FORM
INTERNSHIP APPLICATION FORM
COMPANY LOGO
INTRODUCTORY FILM
GROUP COMPANIES
GÜRİŞ HOLDING CO. INC.
BORDO ELECTRIC ENERGY WHOLESALE CO. INC.
ORTAN NATURAL GAS CO. INC.
SARIKAVAK HEPP
TAHTA HEPP
ATİK WPP
AIR ENERGY SH.P.K.
EXWORKS BAKIM ONARIM VE İŞLETME A.Ş.EXWORKS MAINTENANCE REPAIR AND OPERATION CO. INC
ATLAS VOLOVETS ENERGY LLC
VELESHKOVICHI WES LLC
GÜRİŞ CONSTRUCTION AND ENGINEERING CO. INC.
KÜTAHYA HOSPITAL OPERATIONS AND INVESTMENT INC.
DUMLUPINAR HEALTH SERVICES CO. INC.
MIRAGE PARK HOTEL MANAGEMENT CO. INC.
MOGAN PRIVATE AVIATION CO. INC.
SANTRAL MINING CO. INC.
NORTH CYPRUS SANTRAL MINING INC.
GURIS TEKNOLOJİ A.Ş.
OVID WIND LLC
GÜRİŞ INDUSTRIAL GROUP COMPANIES
GÜRİŞ MACHINERY AND ERECTION CO. INC.
PARSAN MACHINERY COMPONENTS INDUSTRY CO. INC.
GÜRİŞ CONSTRUCTION MACHINERIES INDUSTRY CO. INC.
ASİL STEEL INDUSTRY AND TRADE CO. INC.
OMTAŞ AUTOMOTIVE AND TRANSMISSION COMPONENTS INDUSTRY & TRADE CO. INC.
DÖKTAŞ CASTING AND INDUSTRY CO. INC.
GÜRİŞ RAQQA CEMENT CO.
AL-HASAKEH CEMENT LLC
MOGAN ENERGY INVESTMENT HOLDING CO. INC.
GÜRMAT ELECTRIC GEN. CO. INC.
GALİP HOCA GPP 47.4 MW
EFE 1 GPP 47.4 MW
EFE 2 GPP 22.5 MW
EFE 3 GPP 22.5 MW
EFE 4 GPP 22.5 MW
EFE 6 GPP 22.6 MW
EFE 7 GPP 25 MW
EFE 8 GPP 50 MW
EOLOS WIND ENERGY GEN. CO. INC.
BELEN ELECTRIC GEN. CO. INC.
OLGU ENERGY INVESTMENT GEN. AND TRADE CO. INC.
DERNE CLEAN ENERGY GEN. CO. INC.
KANİJE WPP, 64 MW
ZELİHA WPP, 25.6 MW
FATMA WPP, 80 MW
POKUT ELECTRIC GEN. CO. INC.
ESPİYE ELECTRIC GEN. CO. INC.
ÇERMİKLER ELECTRIC GEN. CO. INC.
AYVACIK ELECTRIC GEN. CO. INC.
İZDEM ENERGY INVESTMENT GEN. & TRADE CO. INC.
ULU RENEWABLE ENERGY GENERATION CO. INC.
GİMAK ENERGY GEN. CO. INC.
PROJECTS
ONGOING PROJECTS
ENERGY
WIND POWER PLANTS
BUILDINGS
HOSPITALS
UNIVERSITY BUILDINGS AND DORMITORIES
INFRASTRUCTURE AND TRANSPORTATION
PIPELINES AND MICROTUNNELLING
INFRASTRUCTURE AND LANDSCAPING PROJECTS
INDUSTRY FACILITIES
CEMENT FACTORIES
COMPLETED PROJECTS
ENERGY
THERMAL POWER PLANTS
HYDROELECTRIC POWER PLANTS
WIND POWER PLANTS
GEOTHERMAL POWER PLANTS
WATER STRUCTURES
DAMS
TREATMENT PLANTS
HARBOURS
IRRIGATION WORKS
BUILDINGS
HOTELS
HOUSING
HOSPITALS
UNIVERSITY BUILDINGS AND DORMITORIES
BUSINESS CENTERS AND ADMINISTRATIVE BUILDINGS
INFRASTRUCTURE AND TRANSPORTATION
PIPELINES AND MICROTUNNELLING
ROADS
RAILWAY SYSTEMS
INDUSTRY FACILITIES
STEEL PLANTS
PETROCHEMICAL FACILITIES AND REFINERIES
CEMENT FACTORIES
PAPER, THREAD AND TIRE FACILITIES
SOCIAL RESPONSIBILITIES
SCHOLARSHIPS
SCHOOLS
NEWS
CATALOG
PDF CATALOG
ONLINE CATALOG
CONTACT
HEAD OFFICE
BRANCH OFFICE AND OUR FACILITIES
OVERSEAS OFFICES
| TR
PROJECTS | GÜRİŞ
HARBOURS
PROJECTS
COMPLETED PROJECTS
WATER STRUCTURES
HARBOURS
MANUFACTURING AND ERECTION OF HARBOUR CRANES
Project Title
:
Manufacturing and Erection of Harbour Cranes
Employer
:
General Directorate of State Railroads, Ports and Airports (DLH)
Location
:
Bandırma – Hopa – Derince – Antalya / Turkey
Completion Date
:
1983
Brief Description
:
Manufacturing and erection of harbour cranes in various ports of Turkey.
İSDEMIR HARBOUR
Project Title
:
İsdemir Harbour
Employer
:
Turkish Iron and Steel Works, Directorate of İskenderun Steel Plant (İSDEMİR)
Location
:
Hatay/Turkey
Completion Date
:
1975
Brief Description
:
Construction of a 247 m. long wharf built on a 914 mm diameter steel piles, each one is being 32 m and adding up to a total length of 3.174 m , where the depth of water is 14 m.
MARMARA ISLAND MARBLE EXPORTATION PORT
Project Title
:
Marmara Island Marble Exportation Port
Employer
:
General Directorate of State Railroads, Ports and Airports (DLH)
Location
:
Balıkesir / Turkey
Completion Date
:
1973
Brief Description
:
Construction of main and secondary breakwaters, and concrete block quays.
FATSA FISHERY PORT
Project Title
:
Fatsa Fishery Port
Employer
:
General Directorate of State Railroads, Ports and Airports (DLH)
Location
:
Ordu / Turkey
Completion Date
:
1969
Brief Description
:
Construction of a 600 m. main and secondary breakwaters, and concrete block quays of 60 m, 240 m. and 100 m. with the depths of -4.00m -1.40 m. and – 1.20 m. respectively.