GURIS
Güriş
  • CORPORATE
    • WE HAVE A MESSAGE
    • IN MEMORY OF İDRİS YAMANTÜRK
    • MISSION, VISION AND VALUES
    • HISTORY OF GÜRİŞ
    • BOARD OF DIRECTORS
    • INFORMATION SECURITY MANAGEMENT SYSTEM
    • INTEGRATED MANAGEMENT SYSTEM
    • MEMBERSHIPS
    • CAREER
      • JOB APPLICATION FORM
      • INTERNSHIP APPLICATION FORM
    • COMPANY LOGO
    • INTRODUCTORY FILM
  • GROUP COMPANIES
    • GÜRİŞ HOLDING CO. INC.
      • BORDO ELECTRIC ENERGY WHOLESALE CO. INC.
      • ORTAN NATURAL GAS CO. INC.
      • SARIKAVAK HEPP
      • TAHTA HEPP
      • ATİK WPP
      • AIR ENERGY SH.P.K.
      • EXWORKS BAKIM ONARIM VE İŞLETME A.Ş.EXWORKS MAINTENANCE REPAIR AND OPERATION CO. INC
      • ATLAS VOLOVETS ENERGY LLC
      • VELESHKOVICHI WES LLC
      • GÜRİŞ CONSTRUCTION AND ENGINEERING CO. INC.
      • KÜTAHYA HOSPITAL OPERATIONS AND INVESTMENT INC.
      • DUMLUPINAR HEALTH SERVICES CO. INC.
      • MIRAGE PARK HOTEL MANAGEMENT CO. INC.
      • MOGAN PRIVATE AVIATION CO. INC.
      • SANTRAL MINING CO. INC.
      • NORTH CYPRUS SANTRAL MINING INC.
      • GURIS TEKNOLOJİ A.Ş.
      • OVID WIND LLC
    • GÜRİŞ INDUSTRIAL GROUP COMPANIES
      • GÜRİŞ MACHINERY AND ERECTION CO. INC.
      • PARSAN MACHINERY COMPONENTS INDUSTRY CO. INC.
      • GÜRİŞ CONSTRUCTION MACHINERIES INDUSTRY CO. INC.
      • ASİL STEEL INDUSTRY AND TRADE CO. INC.
      • OMTAŞ AUTOMOTIVE AND TRANSMISSION COMPONENTS INDUSTRY & TRADE CO. INC.
      • DÖKTAŞ CASTING AND INDUSTRY CO. INC.
      • GÜRİŞ RAQQA CEMENT CO.
      • AL-HASAKEH CEMENT LLC
    • MOGAN ENERGY INVESTMENT HOLDING CO. INC.
      • GÜRMAT ELECTRIC GEN. CO. INC.
        • GALİP HOCA GPP 47.4 MW
        • EFE 1 GPP 47.4 MW
        • EFE 2 GPP 22.5 MW
        • EFE 3 GPP 22.5 MW
        • EFE 4 GPP 22.5 MW
        • EFE 6 GPP 22.6 MW
        • EFE 7 GPP 25 MW
        • EFE 8 GPP 50 MW
      • EOLOS WIND ENERGY GEN. CO. INC.
      • BELEN ELECTRIC GEN. CO. INC.
      • OLGU ENERGY INVESTMENT GEN. AND TRADE CO. INC.
      • DERNE CLEAN ENERGY GEN. CO. INC.
        • KANİJE WPP, 64 MW
        • ZELİHA WPP, 25.6 MW
        • FATMA WPP, 80 MW
      • POKUT ELECTRIC GEN. CO. INC.
      • ESPİYE ELECTRIC GEN. CO. INC.
      • ÇERMİKLER ELECTRIC GEN. CO. INC.
      • AYVACIK ELECTRIC GEN. CO. INC.
      • İZDEM ENERGY INVESTMENT GEN. & TRADE CO. INC.
      • ULU RENEWABLE ENERGY GENERATION CO. INC.
      • GİMAK ENERGY GEN. CO. INC.
  • PROJECTS
    • ONGOING PROJECTS
      • ENERGY
        • WIND POWER PLANTS
      • BUILDINGS
        • HOSPITALS
        • UNIVERSITY BUILDINGS AND DORMITORIES
      • INFRASTRUCTURE AND TRANSPORTATION
        • PIPELINES AND MICROTUNNELLING
        • INFRASTRUCTURE AND LANDSCAPING PROJECTS
      • INDUSTRY FACILITIES
        • CEMENT FACTORIES
    • COMPLETED PROJECTS
      • ENERGY
        • THERMAL POWER PLANTS
        • HYDROELECTRIC POWER PLANTS
        • WIND POWER PLANTS
        • GEOTHERMAL POWER PLANTS
      • WATER STRUCTURES
        • DAMS
        • TREATMENT PLANTS
        • HARBOURS
        • IRRIGATION WORKS
      • BUILDINGS
        • HOTELS
        • HOUSING
        • HOSPITALS
        • UNIVERSITY BUILDINGS AND DORMITORIES
        • BUSINESS CENTERS AND ADMINISTRATIVE BUILDINGS
      • INFRASTRUCTURE AND TRANSPORTATION
        • PIPELINES AND MICROTUNNELLING
        • ROADS
        • RAILWAY SYSTEMS
      • INDUSTRY FACILITIES
        • STEEL PLANTS
        • PETROCHEMICAL FACILITIES AND REFINERIES
        • CEMENT FACTORIES
        • PAPER, THREAD AND TIRE FACILITIES
  • SOCIAL RESPONSIBILITIES
    • SCHOLARSHIPS
    • SCHOOLS
  • NEWS
  • CATALOG
    • PDF CATALOG
    • ONLINE CATALOG
  • CONTACT
    • HEAD OFFICE
    • BRANCH OFFICE AND OUR FACILITIES
    • OVERSEAS OFFICES
  • | TR
PROJECTS | GÜRİŞ

RAILWAY SYSTEMS

    PROJECTS    COMPLETED PROJECTS    INFRASTRUCTURE AND TRANSPORTATION     RAILWAY SYSTEMS
 

CONSTRUCTION OF UNKAPANI-YENİKAPI PART OF İSTANBUL METRO

Project Title:Construction of Unkapanı-Yenikapı Part of Istanbul Metro
Employer :İstanbul Metropolitan Municipality
Location :İstanbul / Turkey
Status :2016
Partnership :GÜRİŞ - YÜKSEL - BAŞYAZICIOĞLU - REHA Joint Venture
Brief Description :

Scope of the project comprises the construction of tunneling works by NATM method and 2 station buildings of the metro line between Unkapanı and Yenikapı.

  
  • CONSTRUCTION OF UNKAPANI-YENİKAPI PART OF İSTANBUL METRO
  • CONSTRUCTION OF UNKAPANI-YENİKAPI PART OF İSTANBUL METRO
  • CONSTRUCTION OF UNKAPANI-YENİKAPI PART OF İSTANBUL METRO
  • CONSTRUCTION OF UNKAPANI-YENİKAPI PART OF İSTANBUL METRO

 

ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART

Project Title:Ankara Metro 3rd Stage Batıkent – Sincan Part
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :2011
Brief Description :

The project comprises the design and construction of  the metro line with a total length of 15,4 km and of  11 stations.

  
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART
  • ANKARA METRO 3rd STAGE BATIKENT – SİNCAN PART

 

METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2

Project Title:Metro line between Kızılay and Çayyolu 2
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :2011
Partnership :GÜRİŞ - AKTÜRK Joint Venture
Brief Description :

The project comprises the design and construction of the metro line with a total length of 16,59 km and of 11 station buildings.

  
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2
  • METRO LINE BETWEEN KIZILAY AND ÇAYYOLU 2

 

CONSTRUCTION OF UNKAPANI – TAKSİM PART OF ISTANBUL METRO

Project Title:Construction of Unkapanı – Taksim Part of Istanbul Metro
Employer :İstanbul Metropolitan Municipality
Location :İstanbul / Turkey
Completion Date :2005
Partnership :GÜRİŞ - YÜKSEL - REHA - BAŞYAZICIOĞLU Joint Venture
Brief Description :

Within the scope of  Unkapanı Taksim part of İstanbul Metro the tunnels have been constructed with NATM (New Austrian Tunneling Method) method including preliminary support system on decomposed, greywacke ground by umbrella arch system, PVC water insulation membrane, reinforced concrete internal lining of the tunnels, the prestressed anchorage wall of the stations. Total length of the tunnel is 4.029 meters. The concourse area of Sishane Station is 3.917 m2.

  
  • CONSTRUCTION OF UNKAPANI – TAKSİM PART OF İSTANBUL METRO

 

BURSA LIGHT RAIL SYSTEM PHASE I

Project Title:Bursa Light Rail System Phase I
Employer :Bursa Metropolitan Municipality
Location :Bursa / Turkey
Completion Date :2002
Partnership :GÜRİŞ - SIEMENS - SIMKO - TUVASAS - ANSALDO Joint Venture
Brief Description :

The scope of the project comprises the following;

ØOpen – Close Tunnel, underground and above ground stations, line works, water, sewerage, telecom, electric, natural gas NATO pipeline infrastructure displacement works,
ØConstruction, installation and steel construction works of the transmission and maintenance center (OMC Building with 10,000 m² indoor area) which is required for the system,
ØConstruction works between the route and operation and maintenance center and within the operation maintenance center area,
ØConstruction and installation works of 17 above ground and underground stations  planned along the route,
ØConstruction works of transformer / Rectifier centers which will meet the energy requirement of Phase I,
ØConstruction works related to the energy feeding lines, overhead systems, posts of the whole route.
  
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I
  • BURSA LIGHT RAIL SYSTEM PHASE I

 

ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION

Project Title:Ankara Metro System 1st Stage Construction
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :1997
Partnership :GÜRİŞ - GAMA Joint Venture
Brief Description :

The project comprises the turn key construction of the metro line system of a total length of 14,44 km (double lines) between Kızılay and Batıkent in Ankara.

  
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION
  • ANKARA METRO SYSTEM 1. STAGE CONSTRUCTION

 

CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION

Project Title:Construction of Ankaray and Ankara Metro Kızılay Common Station
Employer :Ankara Metropolitan Municipality
Location :Ankara / Turkey
Completion Date :1996
Partnership :GÜRİŞ - GAMA Joint Venture
Brief Description :

The project comprises the construction of Ankaray and Ankara Metro Kızılay Common Station, Mezzanine and Platform Floors and the Ankara Metro Switch Structure and Tail Tunnel by top down method.

  
  • CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION
  • CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION
  • CONSTRUCTION OF ANKARAY AND ANKARA METRO KIZILAY COMMON STATION

 

QUICK LINKS

  • SCHOOLS
  • INTEGRATED MANAGEMENT SYSTEM
  • BOARD OF DIRECTORS
  • MISSION, VISION AND VALUES
  • WE HAVE A MESSAGE
  • HOME PAGE

CONTACT

GURIS CONSTRUCTION ENGINEERING CO. INC.
ANKARA CADDESİ NO: 222
GAZİOSMANPAŞA MAHALLESİ
GÖLBAŞI 06830
ANKARA
TURKEY

 
© 2015 GÜRİŞ  Terms Of Use