Brief Description | : | Construction of the geothermal power plant with a total installed capacity of 162.3 MW including two 47.4 MW (EFE 1 - 2 - 3 - 4 ) Dual Flash Units, three 22.5 MW Binary Cycle Units, 22.6 MW (EFE 6) Binary Cycle Unit, 25 MW (EFE 7) Binary Cycle Unit and two 25 MW (EFE 8) Binary Cycle Units. |