Scope of the project comprises the construction of total length is around 73 Km. 9 main irrigation lines with diameter between 300 and 1200mm in various parts of Dubai City. Works include also the construction of chambers and installation of pressure reducing valves, electromagnetic flow meters, installation and commissioning of a SCADA system to control and monitoring the network and additionally installation and commissioning of two pumps at AL AVIR STP.
- 73 km of GRP pipeline (Ø500 to Ø1200)
- 175 nos. of valve and control chambers
- Booster Pump Station (2000m3/d, 100m of head)
- SCADA systems
- 3000m of pipelines with NDM (Close shield TBM)