Following works have been accomplished within the scope of the project:
ØExcavation :53.600 m³
ØSteel driven piles : 108.742 m
ØReinforced concrete : 46.500 m³
ØPreparation and installation of deformed rebar. : 2.700 ton
ØFormwork : 45.300 m²
ØSteel sheet covering : 66.400 m²
ØTechnological equipment installation : 11.500 ton
ØStructural Steel Erection : 11.300 ton
ØPiping Works including auxiliaries : 82.000m
ØInstallation of electrical motors : 522 no
ØInstallation of electrical cables : 545.000 m
ØInstallation of electrical conduits : 102.000m