|
Ulu WPP located in Bursa, İnegöl-Keleş with installed capacity of 120 MW has been commissioned with all turbines installed enabling GÜRİŞ / MOGAN to reach an installed capacity of 1132 MW. Adding Ulu WPP to our portfolio with full capacity; as GÜRİŞ / MOGAN we shall be able to produce 4.200.000.000 kWh of electricity and be able to provide the comsumption needs of 1.700.000 households.
|